Your browser does not support script
  • Aurizona Gold Mine
  • Cachoeira Project
  • Maranhão Greenfields


Aurizona Exploration Photos

Click on the thumbnail to enlarge
  • Jun 01, 2011
    	Senior Mining Technician supervisingthe preparation of Aurizona drill core samples for shipment to assay lab Drilling shallow infill holes designed to upgrade in pit inferred mineralization on sections 700W and 800W, Piaba deposit, Aurizona Senior Mining Technicians checking drill core recoveries on site, Piaba deposit, Aurizona
  • May 01, 2011
    Diamond drilling on section 250W, Piaba deposit, Aurizona Diamond drilling on section 350W, Piaba deposit, Aurizona Mobilizing drill rig to section 600W, Piaba deposit, Aurizona Mobilizing drill rig to section 600W, Piaba deposit, Aurizona
  • May 01, 2011
    Setting up RC rig targeting eastern extension to the Piaba deposit, Aurizona Setting up RC rig targeting eastern extension to the Piaba deposit, Aurizona RC drilling targeting eastern extension to the Piaba deposit, Aurizona RC drilling targeting eastern extension to the Piaba deposit, Aurizona Diamond drilling on section 50E, Piaba deposit, Aurizona
  • Mar 01, 2011
    Trenching at the Conceição Target, Aurizona Trenching at the Conceição Target, Aurizona
  • Dec 01, 2010
    Trench sampling at the Ferradura Target, Aurizona Drill rigs on sections 700W, 800W and 900W, Piaba deposit, Aurizona
  • Nov 01, 2010
    Trenching at the Boa Esperança Target, Aurizona Trenching at the Boa Esperança Target, Aurizona
  • Oct 01, 2010
    Drill rigs at the Piaba deposit, Aurizona Drill core inspection, Piaba deposit, Aurizona Daily Safety Dialogue (DDS), Exploration Team, Aurizona.
  • Sep 01, 2010
    Geophysical training course, Aurizona Geophysical training course, Aurizona Geophysical training course, Aurizona Diamond drill mobilization, Piaba deposit, Aurizona Main Drill surveying, Piaba deposit, Aurizona Main Diamond drilling, Piaba deposit, Aurizona Main Diamond drilling, Piaba deposit, Aurizona Main Cutting core from hole BRAZD279, Piaba deposit
  • Nov 01, 2009
    Sampling of historic exploration pits, Aurizona Main
  • Aug 01, 2009
    Aurizona core storage facility
  • Jul 01, 2009
    Sampling quartz veins, Aurizona Main
  • Jun 01, 2009
    DGPS surveying of Piaba drill collars
  • May 01, 2009
    Piaba drill sample verification prior to dispatch Recon sampling of artesanal workings, Aurizona Regional
  • Jan 01, 2009
    Auger drill crew demobilization
  • Jun 01, 2008
    Drill core cutting, Aurizona Drill core sampling for metallurgical testwork
  • Feb 01, 2008
    Diamond drilling, Piaba Deposit
  • Dec 01, 2007
    Drill core collection, Tatajuba Deposit
  • Dec 01, 2007
    Aurizona secure drill core sample storage facility
  • Nov 01, 2007
    Bulk sampling for metallurgical testwork, Piaba Deposit Bulk sampling for metallurgical testwork, Piaba Deposit
  • Oct 01, 2007
    Diamond drilling, Piaba Deposit